The most expensive mistakes are made at the desk, not in the clean room

A few bad decisions at the concept stage can later cost delays and extra expenses. Here are the most common traps in clean room and pharmaceutical plant projects.

Mariusz Trojanowski, Co-founder of Bionexen
01
Designing for something that does not exist
On paper everything looks great. But if an element cannot realistically be bought in our supply chain, the search for substitutes, rework and unnecessary expense begins.
02
Overlooking regulatory requirements (FDA, EU Annex 1)
Not knowing the documentation, critical parameters and aseptic principles often ends in non-conformities. These can be costly, sometimes even requiring part of the installation to be rebuilt.
03
Too little space for logistics and storage
Zones that are too small for pallets, trolleys or containers only show up on site. Then it turns out there is no room to work.
04
Utilities oversized “just in case”
Too large a margin in the utilities design means higher CAPEX and OPEX, often with no real justification in the process.
05
No understanding of day-to-day work in clean rooms
If the designer does not know the realities of the operators’ work, ergonomics, the flows of people and materials and minimal contact with the critical zone will not be considered. The result is difficult operation and lower efficiency.

Worth remembering

Safety buffers in space and utilities are tempting, but they are often a trap. It is better to base decisions on a solid URS, process risk analysis and data from end users.

The most expensive mistakes come from designing at a desk, without talking to the people who actually work in clean rooms.

Have you had a situation where a wrong concept led to delays or higher costs? Write to me.