We answer the questions we hear most often: about single-use systems and about the design of areas requiring clean rooms.
SINGLE-USE SYSTEMS
Questions about SUS
SUS or stainless steel: which to choose?
It depends on scale, the number of batches and the process requirements. SUS removes cleaning and sterilisation of the installation and cleaning validation, shortens turnaround between batches and reduces the risk of cross-contamination. That is why it works well for small and medium batches and many products. Stainless steel can be more economical for very large, repeatable volumes, and a hybrid solution is often best. We will work it out together on your data.
How do I order a custom assembly?
You send us a drawing (a simple sketch is enough) or a description of what the assembly should do in your process. We review and optimise the design, agree the final drawing with you, and then the assembly is manufactured and delivered.
How long does it take to prepare a custom assembly?
The lead time depends on the complexity of the assembly and the availability of components. We give a specific time in the offer, once the drawing is agreed.
What are the bags made of and what testing do they have?
Biocompatible PE film with a barrier layer. The film has passed tests including USP Class VI, USP 85, ISO 10993 and European Pharmacopoeia 3.1.5. Extractables data is available on request.
What bag volumes are available?
2D bags from 100 ml to 20 L, 3D bags from 50 to 3000 L.
What do ready-to-use (RTU) solutions offer?
Savings in time and cost, because you do not have to prepare solutions in-house. Lower contamination risk thanks to sterile packaging and easy connection. Flexible scale, from research to production. Better process control thanks to standardised, certified solutions.
Does SUS require additional assessment by the user?
Yes. GMP requirements expect an assessment of the supplier and materials, including extractables and leachables and the integrity of the assembly. We help gather the data needed for such an assessment.
Do you help with SUS implementation?
Yes. We support you from choosing the solution to applying it in your process.
CLEAN AREAS
Questions about clean room design
Where do we start a clean area project?
With the URS, the user requirements specification: what you produce or test, at what scale, the flows of people, materials and waste, and which requirements apply. Only on that basis do we lay out the rooms and cleanliness zones.
What is the difference between greenfield and brownfield?
Greenfield is a new plant where the layout and installations can be planned from scratch. Brownfield is an upgrade or extension of an existing facility: the constraints of the building and installations must be taken into account, and often the continuity of operations.
How do GMP cleanliness grades relate to ISO 14644?
Grade A corresponds to ISO 5. Grade B corresponds to ISO 5 at rest and ISO 7 in operation. Grade C is ISO 7 at rest and ISO 8 in operation, and grade D is ISO 8 at rest. We select them according to the process and the risk to the product.
What does Annex 1 change in the design of aseptic zones?
The revised EU GMP Annex 1 has applied since August 2023. It emphasises a contamination control strategy (CCS), risk management, barrier technologies and the assessment of single-use systems in use. In a project this translates into the zone layout, flows and the choice of equipment.
What are the stages of a project?
Conceptual design (room layout, zones, flows), building permit design (documentation for decisions and permits) and detailed design (detailed documentation for contractors).
Do you help with qualification?
Yes. We prepare the URS and support the qualification of areas, installations and equipment (DQ, IQ, OQ, PQ).
Why is purified water part of the project?
Water is one of the key utilities in production and laboratories. We design the system (RO/EDI) together with the clean area, so that capacity and distribution match the process and pharmacopoeia requirements.
Do you also design areas for industries outside pharma?
Yes. We design areas requiring clean rooms for biotechnology, laboratories, medical devices, cosmetics and other industries where cleanliness matters.
How long does a project take?
It depends on the size of the facility and the scope of work. After a conversation about the URS we present a schedule for the specific project.
BLOG
Articles and observations from practice
We write about what we see in projects: single-use systems, design mistakes and the requirements that change the way we design.
01
The single-use revolution in biotechnology: why the future belongs to disposable systems
The global single-use bioprocessing market is set to grow from USD 33.55 billion in 2024 to USD 151.48 billion in 2034. Companies do not move to single-use without a reason.
Read the article →
02
The most expensive mistakes are made at the desk, not in the clean room
A few bad decisions at the concept stage can later cost delays and extra expenses. Here are the most common traps in clean room and pharmaceutical plant projects.
Read the article →
03
A perfect project in theory. A failure in practice
Designing a clean room does not start with standards, but with the people who work in it.
Read the article →
04
Single-use or stainless? Let’s work it out calmly and with data
“Single-use systems are more expensive to run.” It varies: everything depends on what we count and what our goal is.
Read the article →
05
Annex 1: what does it really change in the design of aseptic zones?
A contamination control strategy can no longer be “added at the end”. The new Annex 1 changes the way we think about the whole manufacturing chain.
Read the article →
Have a question that is not here?
Write to me. I will answer and add the answer to this page.